receive: Extend shutdown grace period to 900s #118
Merged
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Changes
Extend shutdown grace period of Thanos receive to 900s (15min). 15min is a reasonably large upper limit, anything larger than that should be sharded out further, to reduce the instance size.
We recently had a service degradation that should have lasted less long as the WAL should have been cut gracefully and not replayed after restart.
Verification
I see the number change 🙂
@metalmatze @squat @kakkoyun