Skip to content
This repository has been archived by the owner on Feb 22, 2022. It is now read-only.

[stable/gocd] Bump up GoCD Version to 20.6.0 #23382

Merged
merged 2 commits into from
Jul 29, 2020
Merged

[stable/gocd] Bump up GoCD Version to 20.6.0 #23382

merged 2 commits into from
Jul 29, 2020

Conversation

gocd-ci-user
Copy link
Contributor

No description provided.

GoCD Build User added 2 commits July 29, 2020 00:56
Signed-off-by: GoCD Build User <go-cd@googlegroups.com>
Signed-off-by: GoCD Build User <go-cd@googlegroups.com>
@helm-bot helm-bot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label Jul 29, 2020
@k8s-ci-robot k8s-ci-robot added the needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. label Jul 29, 2020
@k8s-ci-robot
Copy link
Contributor

Hi @gocd-ci-user. Thanks for your PR.

I'm waiting for a helm member to verify that this patch is reasonable to test. If it is, they should reply with /ok-to-test on its own line. Until that is done, I will not automatically test new commits in this PR, but the usual testing commands by org members will still work. Regular contributors should join the org to skip this step.

Once the patch is verified, the new status will be reflected by the ok-to-test label.

I understand the commands that are listed here.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@kritika-singh3
Copy link

/ok-to-test

@k8s-ci-robot
Copy link
Contributor

@kritika-singh3: Cannot trigger testing until a trusted user reviews the PR and leaves an /ok-to-test message.

In response to this:

/ok-to-test

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@kritika-singh3
Copy link

/lgtm

@k8s-ci-robot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: gocd-ci-user, kritika-singh3

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@k8s-ci-robot k8s-ci-robot added approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. labels Jul 29, 2020
@GaneshSPatil
Copy link
Collaborator

/ok-to-test

@k8s-ci-robot k8s-ci-robot added ok-to-test and removed needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. labels Jul 29, 2020
@k8s-ci-robot k8s-ci-robot merged commit 149b0f0 into helm:master Jul 29, 2020
@kritika-singh3 kritika-singh3 deleted the bump-gocd-version-to-20.6.0 branch July 29, 2020 08:10
li-adrienloiseau pushed a commit to li-adrienloiseau/charts that referenced this pull request Jul 29, 2020
* Bump up GoCD Version to 20.6.0

Signed-off-by: GoCD Build User <go-cd@googlegroups.com>

* Updated Changelog.

Signed-off-by: GoCD Build User <go-cd@googlegroups.com>

Co-authored-by: GoCD Build User <go-cd@googlegroups.com>
Signed-off-by: Adrien Loiseau <adrien.loiseau@logic-immo.com>
mmingorance-dh pushed a commit to mmingorance-dh/charts that referenced this pull request Aug 28, 2020
* Bump up GoCD Version to 20.6.0

Signed-off-by: GoCD Build User <go-cd@googlegroups.com>

* Updated Changelog.

Signed-off-by: GoCD Build User <go-cd@googlegroups.com>

Co-authored-by: GoCD Build User <go-cd@googlegroups.com>
Signed-off-by: Miguel Mingorance <miguel.mingorance@deliveryhero.com>
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
approved Indicates a PR has been approved by an approver from all required OWNERS files. Contribution Allowed If the contributor has signed the DCO or the CNCF CLA (prior to the move to a DCO). lgtm Indicates that a PR is ready to be merged. ok-to-test size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

5 participants